Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Configuring Samsung SPC-7000  control control panel

Configure Samsung SPC-7000   telemetry control panel in Intellect as follows:

  1. Create the Telemetry control panel object.

    Info
    titleNote.
    You can leave default settings of the Telemetry control panel object.
  2. Create the Control panel object.
    Image Modified
  3. SelectSamsung SPC-7000  in the Port field (1).

    Info
    titleNote.
    As the control panel is connected to the computer via USB, then you can leave default Speed, Parity, DTR and RTS settings.
  4. To apply the changes click the Apply button (2).

Samsung SPC-7000  panel is now configured.

Example of script in JScript

The link provides the file containing the script on JScript, which allows assigning actions to the keys of the Samsung SPC-7000  telemetry control panel as in the manufacturer’s manual.