To manage the configuration of the AccessNet (ABC v.2) controller, do the following:

  1. Go to the settings panel of the ABC v2 controller object.
  2. Click the Record date and time button to record the current date and time of the Axxon PSIM Server to the AccessNet (ABC v.2) controller.
  3. Click the Record memory allocation button to record the specified memory allocation to the AccessNet (ABC v.2) controller (see Configuring memory allocation of the AccessNet (ABC v.2) controller).
  4. Click the Save configuration button to save the current configuration to the AccessNet (ABC v.2) controller.
  5. Click the Write access settings button to write the data of the Access Manager module to the AccessNet (ABC v.2) controller.
  6. Click the Apply button to save the changes.

Managing the configuration of the AccessNet (ABC v.2) controller is complete.