Go to documentation repository
Note.
The PowerChute utility configuring process is given in this document as an example. Alternative software can have different settings.
Alternative software must allow binding certain reactions with UPS events.
To set up the PowerChute plus utility:
ID Code | Event Name | Description |
1000 | PowerChute Started | PowerChute service started |
1001 | PowerChute Stopped | PowerChute service stopped |
1002 | Communication Established | Communication restored |
1003 | Utility Power Restored | Electricity restored |
1004 | UPS Self-Test Passed | Self-Test passed |
1005 | Administrative Shutdown | Administrative shutdown |
1006 | Shutdown Cancelled | Shutdown cancelled |
1007 | Returned From Low Battery | Battey charged |
1009 | UPS Battery Replaced | Battery replaced |
1013 | Overload Condition Solved | Overload is back to normal |
1014 | Runtime Calibration Started | Runtime Calibration Started |
1015 | Runtime Calibration Finished | Runtime Calibration Finished |
1016 | System Shutdown Starting | System is shutting down |
1102 | UPS Internal Temperature In Bounds | Internal temperature is in bounds |
2000 | UPS On Battery | Electricity turned off |
2001 | System Shutdown Complete | System performed shutdown |
2002 | UPS Enabling SmartBoost | Low-voltage mode |
2003 | Low Battery Condition | Battery is running low |
2004 | Runtime Calibration Aborted | Runtime Calibration Aborted |
2007 | UPS Enabling SmartTrim | High-voltage mode |
3000 | Lost Communication With UPS | Communication lost |
3001 | UPS Output Overload | Overload |
3002 | UPS Self-Test Failed | Self-Test failed |
3003 | UPS Battery Is Discharged | Battery discharged |
3004 | Comm Lost While On Battery | Comm Lost While On Battery |
3016 | Battery Needs Replacing | Must replace battery |
3107 | Maximum Internal Temperature Exceeded | High internal temperature |
PowerChute plus can be configured so that any of the events listed previously can be sent to the Server of control.
Events marked in green are highly recommended for sending to Server of control.
The <Axxon PSIM installation>\Vhost\UPS\Ext\ folder also includes three executables that have been created for specific events:
This minimal set can be used with different series of Back-UPS that do not support calling third-party subprograms with the command line.