Documentation for Intellect Web Report System 3.4. Documentation for other versions of Intellect Web Report System is available too.

Previous page Next page

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

In order to create a protocol report, do the following:

  1. Select the Change protocol report type (see Selecting a type of general report section).
  2. As a result the dialog box for specifying the report parameters will be displayed.

Set the following report parameters:

  1. In the Object type: field set checkboxes in those types of objects to which the changed, created or removed object belongs (1).

    Note

    Any objects can be selected by expanding the object type list.

  2. In the Operators: field set checkboxes in those users who have rights to change objects (2). The Unathorized user value means change of system by unathorized user, deleted user and/or user with deleted rights.
  3. To display deleted objects in the report set the corresponding checkbox (3).
  4. To display created objects in the report set the corresponding checkbox (4).
  5. To display objects which have been changed set the Change objects checkbox (5).
  6. Specify the period in the following way:
    1. From the Period: drop-down list select the time period for which the report is to be created (6).
    2. If the User defined period is selected, enter the date of start and end periods for which the report is to be created in the from and to fields using the Calendar tool. Click the  button near the corresponding field to use the Calendar tool.
  7. To create a report click Execute (7).

As a result a change protocol report with specified parameters is displayed.

Note

The ID of the object is specified in square brackets in the end of the object name in the Object name field.

Note

In the created report objects are sorted by their ID and by the event date.

  • No labels